Gold Member Since 2010
Audited Supplier
Camda New Energy Equipment Co., Ltd.

Biogas Purification, Biogas Treatment, Biomass Scrubber manufacturer / supplier in China, offering Biomass Purifying Unit/Biogas Treatment System/Biomass Scrubber/Methane Gas Purifier, CE Approved 200kVA Biogas Generator (KDGH), High Quality 50kw CHP Generator / Biogas Generator / Methane Gas Generator with ISO and CE and so on.

(/ )

Supplier Homepage Product scrubber Biomass Purifying Unit/Biogas Treatment System/Biomass Scrubber/Methane Gas Purifier

Biomass Purifying Unit/Biogas Treatment System/Biomass Scrubber/Methane Gas Purifier

FOB Price: US $5,800-16,000 / unit
Min. Order: 1 unit
Min. Order FOB Price
1 unit US $5,800-16,000/ unit
Get Latest Price
Production Capacity: 5000 Units/Year
Transport Package: Wood Case or Plastic Film
Payment Terms: L/C, T/T, D/P, Paypal, Money Gram, Western Union, O/A 90 Days

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Model NO.: KDCL50
  • Speed: 1500 / 1800 Rpm
  • Rated Power: 20kw-250kw
  • Rated Current: 40A-600A
  • Working Pressure: 4~40kpa
  • Option: Desulfurization/De-Dust/De-Water/Increase Pressure
  • Specification: CE & ISO
  • Output Type: AC Three Phase
  • Frequency: 50Hz/60Hz
  • Rated Voltage: 220V-415V (Can Be Adjusted)
  • Color: Blue/Red
  • Gas Flow: 40-120nm3/Hr
  • Trademark: CAMDA
  • Origin: Guangdong, China (Mainland)
Product Description
CAMDA High-quality Biomass purifying unit/biogas treatment system/biomass scrubber/methane gas purifier


Application field and Environment


The skid-mounted biogas pre-treatment system adopts the dry desulfurization system which is applicable for small industrial devices whose H2S is less than 2000ppm. The biggest skid-mounted pre-treatment system can deal with 300Nm3/h biogas and we suggest it to be used in farmland which can equipped with CHP system. In the industrial waste water biogas project, if the devices has to run long time in a day, the H2S is high and has to synchronize with the nation grid, the biogas dry desulfurization system has to be designed specifically.


The working area ambient temperature should be in the range of 0 ~ 50 ° C due to the drained water from the pre-treatment. If there is any underground sewage wells, the system has to anti-freezing and anti-cracking. This system is better to be installed in a well-ventilated room.
Biomass Treatment System Specifications
KDCL-50 series Biomass Pre-treatment System  
1. Main Specificstions  
Model KDCL-50-WQ
The suitable genset power 20KW-50KW
Dimension 2000×1600×2160 (mm)
Weight 2000kg
Gas flow 40~80Nm3/hr
Working pressure 4~40KPa
Desulfurizer amount 2×200kg
The changing time of desulfurizer 1500 hours
Parts per million after purifying 200ppm
The designed lifetime 15years
   
   
2. The Main Equipment  
1. Name Desulfurizing tower
   Qty 2 unit
   Model KDTL-250-G   
Specificstions Φ500×1880
Function Desulfurization
2. Name Separator
   Qty 1unit
   Model KDFC-200-G
Function 1. Gas buffter; 2. De-Dust
3. Name Water condenser
   Qty 1unit
   Model KDYS-20-G
Function De-water before desulfurizing tower
4. Name Blower
   Qty 1unit
   Model NSR50-50A
Specificstions 1.1KW
Function Increase pressure and steady pressure
   
3. The main function of this system  
1. Desulfurization  
2. De-dust  
3. De-water  
4. Increase pressure  
5. Stabilize pressure  
6. Change desulfurizer without stopping genset  
Send your message to this supplier
Avatar
Mrs. Ade
General Manager
*From:
To: Mrs. Ade
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now